Browsing by "Subject"
Tünel
Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
     
88-105 / 105
 
PreviewTitleCreatorIssue Date
INEED056.jpg.jpgStation inférieure: Coupe transversale (Échelle: 1/100)-1969-08-29
INEED055.jpg.jpgStation inférieure: Quais evacuation des eaux (Échelle: 1/10, 1/20, 1/50)Çizen - Drawing: P.Y.P.1970-03-09
INEED052.jpg.jpgStation supérieure: Support pour axe de la poulie de renvoi (Échelle: 1/2)Çizen - Drawing: R. Sageret1969-08-29
INEED054.jpg.jpgStation supérieure: Vue en plan (Échelle: 1/20, 1/50)Çizen - Drawing: P.Y.P.1970-03-16
INEED050.jpg.jpgSupport d'ancrage: Pour reprise de tension (Échelle: 1/5)Çizen - Drawing: L. BÉS1969-12-26
INEED018.jpg.jpgSupport de balancier: Ensemble de montageÇizen - Drawing: R. Sageret1969-12-17
INEED062.jpg.jpgSupport de vérins (Échelle: 1/5)Çizen - Drawing: Lebert.B1969-12-11
FFT716028.jpg.jpgTarihe Göre. İstanbul'da yeni tüneller inşası. Geçmişte Bugün. Medine'de Türk MüdafaasıFeridun Fazıl Tülbentçi1950-01-13
INEED072.jpg.jpgTendeur (Échelle: 1/2)Çizen - Drawing: Lebert.B1969-11-28
DUB285001.jpg.jpg
"Thinking Garbage" [Düşünen Çöpler] (Tünel, İstanbul, 2005), sergi afişi - "Thinking Garbage" (Tünel, Istanbul, 2005), exhibition poster-2005-09-17; 2005-10-01
INEED035.jpg.jpgTige de contrepoids d'urgence (Échelle: 1/1)Çizen - Drawing: Lebert.B1969-12-11
INEED017.jpg.jpgTige de contrepoids normal (Échelle: 1/1)Çizen - Drawing: Lebert.B1969-12-11
INEED047.jpg.jpgTige de liaison (Échelle: 1/1)Çizen - Drawing: Lebert.B1969-12-10
INEED061.jpg.jpgTige de poussée (Échelle: 1/2)Çizen - Drawing: Lebert.B1969-12-11
INEED036.jpg.jpgTransformateurs--
INEED031.jpg.jpgTraverses démontables: Support de caténaires ail du support de poulie (Échelle: 1/2, 1/20)Çizen - Drawing: L. BÉS1969-12-26
INEED034.jpg.jpgTraverses support de caténaires (Échelle: 1/2, 1/20)Çizen - Drawing: L. BÉS1969-12-26
AHISTBEYO106.jpg.jpgTünel Meydanı - Tünel Square--
88-105 / 105